Decision Lab / Python + machine learningFictional teaching case

Shipment SHIP-ML-TIMELY · 2026-11-17T14:00:00Z

Should we buy a readiness check?

Review the value of confirming SP-A registration before reserving a complete shipment arrangement.

Decision finding

A registration check improves the modeled choice

Propose the registration check, then choose only a response supported by its actual scoped result.

Reserve now$6,000.00Complete supported arrangement
Check, then respond$5,772.96Expected cost including the check fee
Expected improvement$227.04Relative to reserving now
Estimated readiness25.0%A probability estimate; registration is not confirmed
Available alternatives
AlternativeExecutionComplete costMeaning
Reserve nowAvailable$6,000.00Use a complete arrangement supported across both registration possibilities.
Check before reservingComplete responses available$5,772.96Compare the complete check-and-response alternative with the available arrangement now.

Check and response ready: 10:30 · Reservation cutoff: 12:00. Times use the case's local minute origin.

After each possible result

These are hypothetical responses. A real result needs its own scoped record and review.

Check resultEstimated chanceComplete responseRequired follow-up
Registration confirmed21.4%Direct through SP-AInspect the actual scoped record before accepting a finding.
Nonregistration confirmed59.9%Backup through SP-BInspect the actual scoped record before accepting a finding.
No usable verification result18.7%Backup through SP-BInspect the actual scoped record before accepting a finding.

Inspect the basis

Estimate basis and model validation

Numerical basis accepted by Fictional demo analyst.

Measurements at decision time
Portal listing age (days)14
Prior shipments in 90 days2
Days since the location scope changed10
Open setup tasks3
Held-out validation
EstimatorBrier scoreLog loss
Historical readiness rate0.24900.6911
Logistic regression0.14700.4435
Calibrated classifier0.14810.4463
Estimatorship-point-registration-logistic-v1
Case assessment time2026-11-17T14:00:00Z
Meaning of this estimateProposed calibrated probabilities and observed state-conditional check frequencies; reviewer acceptance is separate.
Uses synthetic teaching dataTrue

The history is synthetic teaching data. These metrics demonstrate the method and establish no real-world performance.

Would a different probability change the choice?

These are declared sensitivity assumptions, not confidence bounds or additional observed evidence.

Assumed registration probabilityPreferred alternativeExpected improvement from checking
10.0%Reserve without another check$-28.90
30.0%Check before reserving$313.29
50.0%Check before reserving$655.48
70.0%Check before reserving$997.67
90.0%Check before reserving$1,339.86
Complete planning checks

The SDK checks the supplied complete plans. A probability estimate does not waive registration, capacity, cash, time or permission requirements.

ContextArrangementFindingComplete expenseBlocking conditions
Reserve nowDirect through SP-ABlocked$4,000.00Scoped transportation registration is confirmed
Reserve nowBackup through SP-BMeets every requirement$6,000.00No blocking condition
After check and responseDirect through SP-ABlocked$4,200.00Scoped transportation registration is confirmed
After check and responseBackup through SP-BMeets every requirement$6,200.00No blocking condition
Retained calculation records

These machine-readable artifacts preserve the complete SDK output and the proposed numerical basis.